Specificationsauto spare part precision tube: 1. MOQ:5MT 2. DN:3/8"-10" 3. Annealed pipes 4. Tolerance:OD +/-0.05-0.20mm auto spare part precision tube specifications Standard ASTM, BS, JIS, DIN,GBSteel GradeASTM A53 A-A106B,SAE1045, GB 10#-45#,DIN st35-st45,BS 1387,JIS S45CDN3/8"-10&......
auto spare part precision tube:
1. MOQ:5MT
2. DN:3/8"-10"
3. Annealed pipes
4. Tolerance:OD +/-0.05-0.20mm

auto spare part precision tube specifications
Standard | ASTM, BS, JIS, DIN,GB |
Steel Grade | ASTM A53 A-A106B,SAE1045, GB 10#-45#,DIN st35-st45,BS 1387,JIS S45C |
DN | 3/8"-10" |
W.T. | 2mm-25mm |
Length | 1-6m |
End protection | plastic caps |
Packing | Wrapped in bundles by steel strips |
Delivery | by container |
Third party inspection | SGS/BV |
Production Capacity | 200,000tons per year |
Delivery time | 20 days |
Application | Machinery, road and construction fields, lifter, tower crane, |
Main market | Asia, India, Middle East, America, Europe |
DIN St37.4
| Chemical Composition(%) | Mechanical Property | |||||||||
| C | Si | Mn | S | P | Cr | Ni | Cu | Mo | Yield Strength | Tensile Strength |
| ( σs ) | ( σb ) | |||||||||
| 0.07~0.17 | 0.15~0.35 | 0.40~0.70 | ≤0.025 | ≤0.025 | ≤0.15 | ≤0.25 | ≤0.25 | / | ≥235 (MPa) | ≥315 |
| (MPa) | ||||||||||
| End Shape | Beveled end, plain end, vanished, or adding plastic caps to protect the two ends as per customer's requirements | |||||||||
| Surface | Oiled, Galvanized, Phosphate etc | |||||||||
| Treatment | ||||||||||
| Technique | Cold drawn | |||||||||
| Application | 1. Automotive and mechanical pipes | |||||||||
| 2. Petroleum cracking pipes | ||||||||||
| 3. High Pressure Boiler Pipe | ||||||||||
| 4. Low and middle pressure fluid transportation pipeline | ||||||||||
| 5. Chemical fertilizer equipment pipes | ||||||||||
| 6. Heat exchanger pipes | ||||||||||
| Delivery | 1. BK (+C) | No heat treatment after last cold forming process. | ||||||||
| Conditions | 2. BKW (+LC) | After last heat treatment there is a light finishing pass (cold drawing) | ||||||||
| 3. BKS (+SR) | After the final cold forming process the tubes are stress relieve annealed. | |||||||||
| 4. GBK (+A) | After the final cold forming process the tubes are annealed in a controlled atmosphere. | |||||||||
| 5. NBK (+N) | After the final cold forming process the tubes are annealed above the upper transformation point in acontrolled atmosphere. | |||||||||
| Package | 1. Bundle Packing. | |||||||||
| 2. Plain end or vanished as per customer's request. | ||||||||||
| 3. Wrapped in waterproof paper. | ||||||||||
| 4. Sackcloth with several steel strips. | ||||||||||
5. Pack in heavy tri-wall boxes. | ||||||||||
Stable Quality Cheap A350-Lf2 1055 1060 1070 1075 1080 1084 1095 Carbon Steel Round Billet Carbon Steel Round Bar
Hot Dipped Concrete Haki System Vertical Tubular Beams Scaffolding
Haki System Welded Construction Tubular Scaffolding Hot Dipped Ledger
Haki Standard Scaffold Frames Construction Ledger for Chemical Industry
Galvanized Haki System Tubular Construction Scaffolding for Gas Drilling
Welded Construction Haki System Tubular Scaffold Frames Galvanized