Product DescriptionProduct nameASTM GB ASME HIGH PRESSURE STEEL TUBE Standard ASME, ASTM, EN ,BS,GB,DIN, JIS API Spec 5L, GB9711, ASTM A53, ASTM A252 ASTM A500 etcGrade10#, 20#, 45#, 12Cr1MoV, 30CrMo, 12Cr1MoVG, 16Mn, St37, St52, St42.Certificate BV, ISO, CE, SGS etcTypeSeamless & weldedOutter D......
| Product name | ASTM GB ASME HIGH PRESSURE STEEL TUBE |
| Standard | ASME, ASTM, EN ,BS,GB,DIN, JIS API Spec 5L, GB9711, ASTM A53, ASTM A252 ASTM A500 etc |
| Grade | 10#, 20#, 45#, 12Cr1MoV, 30CrMo, 12Cr1MoVG, 16Mn, St37, St52, St42. |
| Certificate | BV, ISO, CE, SGS etc |
| Type | Seamless & welded |
| Outter Diameter (OD) | 3-1220mm |
| Thickness | 0.5-50mm |
| Length | 6000mm 5800mm 12000mm or Customized |
| Technique | Cold Drawn or Hot |
| Surface | Black Bright and Painting etc |
| Application | Steel pipe applies to construction field, ships building industry, petroleum & chemical industries,war and electricity industries, food processing and medical industry, boiler heat exchanger,machinery and hardware fields. |
| Packing | Standard export sea-worthy packing |
| Delivery Time | 7-15 Working Days after Deposit |
| TradeTerms | FOB, CFR, CIF, EXW |
| Payment Terms | 30%T/T,L/C |
Scaffolding Steel Pipe | ||
Out diameter (mm) | Wall thickness (mm) | Length (m) |
48.3 (1.5 inch) | 2.5 | 6/9/12 |
48.3 (1.5 inch) | 2.75 | 6/9/12 |
48.3 (1.5 inch) | 3.0 | 6/9/12 |












Trade Information
1.Trade Terms: EXW, FOB, CFR, CIF
2.MOQ: 25MT
3.Payment Terms: 30% deposit by T/T and 70% balance against the copy of B/L by T/T, or irrevocable L/C at sight.
4.Delivery Time: within 15-40 days after receiving your 30% deposit by T/T or your irrevocable L/C at sight.
If you have another question, pls feel free to contact us as below:
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and wooden boxes,or as customers' requirements.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 5 to 7 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
Stable Quality Cheap A350-Lf2 1055 1060 1070 1075 1080 1084 1095 Carbon Steel Round Billet Carbon Steel Round Bar
Hot Dipped Concrete Haki System Vertical Tubular Beams Scaffolding
Haki System Welded Construction Tubular Scaffolding Hot Dipped Ledger
Haki Standard Scaffold Frames Construction Ledger for Chemical Industry
Galvanized Haki System Tubular Construction Scaffolding for Gas Drilling
Welded Construction Haki System Tubular Scaffold Frames Galvanized